Review of Order for Corra Linn Dam
Reviewing the Kootenay Lake Order of Approval
The International Kootenay Lake Board of Control (IKLBC) is reviewing the International Joint Commission's (IJC) 1938 Order of Approval for the Corra Linn Dam, the binding instrument that governs how water is stored on Kootenay Lake and sets the seasonal "rule curve" of maximum lake elevations.
The IJC was established under the 1909 Boundary Waters Treaty between Canada and the United States, and its involvement here reflects the transboundary nature of the lake: Kootenay Lake levels can create backwater effects that extend upstream into the Kootenai River valley in Idaho, affecting agricultural lands, drainage, and groundwater. The Order is now almost 90 years old and was written for a much simpler system; one that predates upstream facilities such as Duncan and Libby Dams, the parallel Kootenay Canal Plant, modern flood-risk management, today's understanding of climate impacts on hydrology, the importance of ecosystem functions, and Indigenous rights and engagement.
Scope and Objectives
This first phase of the review is the development of a Plan of Study. It does not decide whether the Order should change; rather, its purpose is to identify the studies, analyses, engagement, and decision-support information the board and the IJC will need before they can determine whether the 1938 Order should be retained, revised, supplemented, or modernized. A central question is whether the existing rule curve provides enough flexibility for present and future conditions, while keeping flood-risk management and public safety as core constraints.
How the Plan of Study Was Prepared
In September 2025, the IKLBC engaged a consultant to lead development of the Plan of Study. The consultant and Board gathered information from more than 250 technical reports and records, and through extensive engagement including:
In-person public information sessions in Bonners Ferry (December 3, 2025) and Nelson (December 4, 2025), followed by a virtual session on December 9, 2025. LINKS
December 2025 to April 2026: information-gathering sessions with stakeholders, First Nations, and Tribes — 20 listening sessions in total.
Proposed Studies
The Plan of Study recommends first establishing a Technical Working Group to define and translate concepts into consistent, model-ready scenarios (such as flexible spring drawdown, conditional spring exceedance, fall/spring water-level management for West Arm shore-spawning kokanee, earlier spring-rise timing, managed high-water ecological operations, and flood-risk override safeguards). The Plan of Study then proposes conducting a series of studies, to investigate topics such as flood-damage and risk management; Grohman Narrows dredging; agricultural impacts; shore-spawning kokanee; wetlands restoration; hydropower generation and capacity; regulatory and ratepayer implications; downstream aquatic habitat; and compensation methods for Kootenai Flats agricultural producers. The studies will be sequenced so they can build on the evidence previously developed, and all will be evaluated using hydrologic and operations models.
Where Things Stand
In May 2026, Mountain Station Consultants prepared a draft Plan of Study for preliminary Board evaluation. The Board discussed the preliminary findings at its annual in-person meeting on June 2, 2026, and presented them to the public in Nelson (June 2) and Bonners Ferry (June 3). Feedback from the Board is is now being incorporated into the next revision.
Next Steps
From June to October this year, the Board along with the Applicant (FortisBC), First Nations, and Tribes that were engaged, will evaluate and provide comments on the Plan of Study.
A final draft, ready for public review, is expected in mid-November. A 6-week public comment period will take place in November 2026. Announcements will be made on this website and through news releases as to how members of the public can provide feedback.
The Plan of Study is expected to be finalized in January 2027.
Subsequently, in 2027, the Board will prepare and release an Order Review Road Map, including a proposed timeline for completing any studies needed. The study results will be used to developed scenarios that can best serve the broad set of values in the Kootenay basin and how they could be incorporated into a modernized order. Ultimately, the Board will provide a recommendation to the IJC on whether, and if so, how, the current Order of Approval should be updated.
A Note on Scope
This Order Review and Plan of Study is being conducted independently of the Elk/Kootenai Pollution Study and of any work related to the modernization of the Columbia River Treaty. It focuses narrowly on Corra Linn Dam operations and Kootenay Lake levels.
Share Your Input
The Board welcomes feedback throughout this process. To share your comments or questions, please contact the Board secretaries using the “Contact Us” link below.