Dockets - Applications & References

The IJC’s work come from documents received by the Canadian and US governments outlining the IJC’s responsibilities. These are known as applications and references and are organized by docket. Key documents such as letters from governments assigning work to the IJC, task force or study board reports to the IJC, and final reports and letters from the IJC to the governments are available from the website.

Displaying 1 - 12 of 12.

Date
An application by the Georgia-Pacific Corporation to reconstruct and maintain a diversion dyke in the St. Croix River near Baileyville, Maine.
Bundle name
Docket

87A

Date
An Application by the St. Croix Paper Company to replace an existing timber dam at the outlet of East Grand Lake in the St. Croix River at Forest City. (See Dockets 10 and 11).
Bundle name
Docket

80A

Date
An Application by the St. Croix Paper Co. for approval to replace the small storage dam some 30 years old at Vanceboro at the outlet of Spednik Lake.
Bundle name
Docket

72R

Date
A Reference to estimate the cost of developing the international tidal power potential of Passamaquoddy Bay jointly between the United States and Canada. Also, to determine the economic feasibility of the project and its effects on the local and national economies.
Bundle name
Docket

71R

Date
A Reference to study the development of water resources in the St. Croix River basin and to recommend actions for the use, conservation, and regulation of the basin\'s waters.
Bundle name
Docket

60R

Date
A Reference to review existing plans for the development of tidal power in Passamaquoddy and Cobscook Bays and evaluate the costs to determine the practicability of any of the plans.
Bundle name
Docket

32A

Date
An Application by the Canadian Cottons Limited to reconstruct the Milltown Dam on the St. Croix River.
Bundle name
Docket

28A

Date
An Application by the St. Croix Water Power Company and Sprague's Falls Manufacturing Company for approval to raise the maximum forebay level of Grand Falls Dam on the St. Croix River.
Bundle name
Docket

18A

Date
An Application by the 1State of Maine to grant authority to all dam owners on the St. Croix River to erect and repair suitable fish ways in their dams.
Bundle name
Docket

16A

Date
An Application by the 1Canadian Cottons Ltd. to construct a powerhouse on the U.S. side of the St. Croix River at Milltown.
Bundle name
Docket

11A

Date
An Application by the Sprague's Falls Manufacturing Company (See also Docket 10).
Bundle name
Docket

10A

Date
An Application by the St. Croix Water & Power Company for approval of works already under construction, consisting of a dam across the St. Croix River at Grand Falls and also for the diversion of the waters of the river for electric power generation in the State of Maine (See also Docket 11).
Bundle name
Docket