The International Osoyoos Lake Board of Control (the Board) has declared drought conditions for Osoyoos Lake under the International Joint Commission’s (IJC) 2013 Supplementary Order of Approval. The Washington State Department of Ecology (Ecology) is the operator of Zosel Dam, responsible for managing lake levels within the ranges established in the IJC Orders. 

How Drought is Determined 

In dry years, the IJC allows Osoyoos Lake to be managed within a wider range of lake levels than normal. The wider range affords greater flexibility in lake level management to adaptively meet the demands of ecological stream needs, irrigation and recreational users.  

A drought declaration is triggered when multiple hydrologic indicators fall below specific thresholds: 

  • The volume of flow in the Similkameen River from April 1 to July 31  

  • The net inflow into Okanagan Lake from April 1 to July 31 

  • The peak Okanagan Lake level in June or July. 

Drought is declared when the Similkameen indicator as well as at least one of the two Okanagan Lake indicators fall below the thresholds.  

 

Current forecasts show that all three of the drought criteria are likely to be met, prompting the Board to authorize Ecology to operate the lake within the drought range this spring, summer, and fall. 

 

Water supply in the Similkameen River for the period from April 1 to July 31 is currently  forecast by NOAA to be 1.029 million acre-feet, within the range of uncertainty for the 1-million acre-foot drought threshold. The forecast has decreased over the last several days, as snow at lower elevations melts out entirely. 

 

The net inflow to Okanagan Lake for the April to July period is currently forecast at 126,000 acre-feet, which is below the 195,000 acre-feet drought threshold. Additionally, Okanagan Lake is expected to reach a peak elevation of 1122.2 ft (342.05 m), which is below the 1,122.6 ft (342.17 m) drought threshold. 

Graph of Osoyoos Lake Elevation - spring 2026

 

Figure 1: Water year 2026 (bright green) and water year 2025 (dark green) Osoyoos Lake Levels, along with allowable range under the normal rule curve defined by the International Joint Commission Orders of Approval for Osoyoos Lake (solid black).  Expanded drought Conditions rule curve (red dashed). For the period of record from 1987-2025, the mean daily lake level is shown as a black line, and the historical gauged minimum, 10th, 25th, 75th, 90th, and historical gauged maximum lake levels are shaded grey (USGS, IOLBC 2026).  

Dry Conditions Across the Okanagan/Okanogan Basin 

The drought criteria are part of a larger story of dry conditions within the Okanogan/Okanogan Basin: 

  • According to the snow survey, the Okanagan basin had only 31% of normal snowpack on May 1, which is the lowest on record since 1980. The Similkameen basin had 61% of normal snowpack on May 1. 

  • Lower‑elevation snowpack has already melted, weeks earlier than typical. 

  • Upstream, Okanagan Lake is also being managed to store water and sustain basic environmental flows in preparation for a dry summer. 

  •  

What to Expect for Osoyoos Lake Levels 

Ecology has raised Osoyoos Lake to around 912.0 feet (277.98 meters). In the coming days, managers will likely continue to raise the lake to capture spring runoff. 

 

The Board will continue to monitor lake and river conditions. If hydrologic conditions improve, the Board may rescind the drought declaration and direct Ecology to return lake levels to under the normal operating level of 912.0 feet. 

 

Quick Facts    

  • The International Osoyoos Lake Board of Control oversees the operation of Zosel Dam to manage water levels in Osoyoos Lake, which crosses the British Columbia-Washington border.     

  • Annual public board meetings alternate each year between Osoyoos, B.C., and Oroville, WA. The next meeting will be held September 23, 2026, at 6:30-8:00 PM in Oroville, WA.   

  • Stay in touch and subscribe to receive email news updates from the Osoyoos board.  

 

Contacts   

Sarah Dunn, U.S. Secretary   

Martin Suchy, Canadian Secretary   

  

To contact the board by email, use the Contact form on the board’s website.   

Subscribe to receive updates on hydrologic conditions in Osoyoos Lake, Zosel Dam operations, annual public meetings, and special projects.